Saturday 21 March 2015

Reno started with Mr K!


开工!
 Starting of our renovation!

Wall hacking! MBR, Kitchen entrance, Bedroom 3 and electrical box. Almost everywhere that is hack-able we hack it down! 

Finding a slot to meet up with Mr K is already a challenge and finding a slot with BB and him make it almost impossible. Busy Men is hard to date! haha...alright since im the most "free" one i shall not complain..finally i get him to meet k on 6 Mar (friday) to talk about our electrical points and final layout. Mr K chop chop wrote down all the points on the wall and the next following monday he told me all the electrical work is completed. How fast! Can't wait to see my tiles...

MBR with dressing table point
WIW & Study Area
Kitchen 

9 Mar - Installation and relocation of electrical & Data points (Forgot to inform k to add in one more point at my alternate dining wall but K says he will add in for me. Phew~)


13 Mar - Main door cut to align with overlay floor & Tiles in (K called to inform me the tiles will be quite uneven due to the laying pattern we decided >.< I am crossing my fingers now, hopefully it's not that bad) 

20 Mar - The kitchen and living room floor has been done and cover with protection today! I would say is still acceptable. Thanks to Mr K experience tiler who try his best to fit in one by one for us. We understood that it won't be 100% even however we got the look that we want and we are really happy =) 

Our bathroom wall tiles , feature wall and floor tiles from Hafary
The main highlight in our MBR! Feature wall

Kitchen Tiles
MBR Tiles 


31 Mar - All tiles and brick wall are done
               👏👏👏👏







No comments:

Post a Comment